Project details
| Water depth |
12 to 27,5 m |
| Distance to the coast |
27 to 30 km |
| Area |
19,84 km2 (Area A = 10,68 km2 + Area B = 9,16 km2) |
| Total capacity |
325,20 MW |
| Annual generation |
1.000.000.000 kWh or 1000 GWh = Enough energy for the annual consumption of 600.000 inhabitants |
| Avoided CO2 emission |
450,000 tonnes/year (compared with the environmentally most friendly gas power stations) |
= the annual CO2 absorption of a forested area of 87,668 ha = a strip of forest 15 km wide along the entire Belgian coastline = 4 x the area of public forest within the Flemish Region |
| Wind turbines |
Phase 1: 6 x 5 MW each Phase 2: 30 x 6,15 MW each Phase 3: 18 x 6,15 MW each |
| Project phasing |
|
|
|
6 x 5 MW each, construction from May 2007 to June 2009 and production started beginning 2009 |
|
|
30 x 6,15 MW each, construction started in November 2010, expected to be in production from October 2012 |
|
|
18 x 6,15 MW each, construction started in November 2010, expected to be in production from September 2013 |

|