Construction and engineering partners
|


|
Owners Engineer
Responsible for the basic design and supervision of the detailed design.
|
|


|
THV Seawind
Marine and Electrical Contractor responsible for the design, construction and installation of the foundations
|
 |
ABB
Responsible for the design and supply of the complete electrical infrastructure including: Offshore Transformer Station, the array and export cables, onshore grid connection, protection and control system and a long term maintenance agreement
|
 |
Repower Systems
Responsible for the design, supply and installation, management and maintenance of the wind turbines during the first 10 years of exploitation
|
 |
Owec Tower A/S
Responsible for the detailed design of the jacket foundations for the turbines
|
 |
Reinertsen
Responsible for the detailed design of the jacket foundation for the offshore transformer statio
|
 |
HSM – Schiedam
Responsible for the detailed design of the topside structure for the offshore transformer station
|
 |
Smulders Foundations B.V.
EPC Subcontractor Foundations
|
 |
Mwaves
Marine Warranty Surveyor
|
 |
Mott McDonald
Lenders Engineer
|
 |
Det Norske Veritas (DNV)
Certification of the offshore transformer station
|
 |
DEWI-OCC
Certification of the project
|
|