GENERAL INFORMATION

wind turbines Phase I: 6*5MW - Phase II: 24*5,25MW - PhaseIII: 24*6MW
total capacity 300 MW
water depth 12 to 27,5 m 
distance to the coast 27 to 30 km
start construction May 2007
start production start 2009 
Annual generation 1000 GWh
= Enough energy for the annual consumption of 600.000 inhabitants
Avoided CO2 emission   450,000 tonnes/year (compared with the environmentally most friendly gas power stations)
= the annual CO2 absorption of a forested area of 87,668 ha
= a strip of forest 15km wide along the entire Belgian coastline
= 4 x the area of public forest within the Flemish Region
= 1/3rd of the Belgian renewable energy target by 2010
 

 