GENERAL INFORMATION
| wind turbines |
Phase I: 6*5MW - Phase II: 30*6,15MW -
PhaseIII: 18*6,15MW |
| total capacity |
326 MW |
| water depth |
12 to 27,5 m |
| distance to the coast |
27 to 30 km |
| construction (phase I) |
May 2007 to June 2009 |
| start construction (phase II & III) |
November 2010 |
| start production (phase I) |
beginning 2009 |
| expected start production (phase II) |
October 2012 |
| expected start production (phase III) |
September 2013 |
| annual generation |
1.000.000.000 kWh or 1000 GWh
= Enough energy for the annual consumption of 600.000 inhabitants |
| avoided CO2 emission |
450,000 tonnes/year (compared with the
environmentally most friendly gas power stations) |
= the annual CO2 absorption of a forested area of 87,668
ha
= a strip of forest 15km wide along the entire Belgian coastline
= 4 x the area of public forest within the Flemish Region |
|
|
| |
Scheldedijk 30 - Haven 1025 - 2070 Zwijndrecht, Belgium - Tel. + 32-3-250 55 51 - Fax + 32-3-250 55 52 - E-mail: c-power@c-power.be |