PREPARATION
- In order to build this wind farm C-Power needed to carry out a number of legal procedures in order to obtain the necessary permits.
- In view of the complexity of construction 30km out at sea, the condition of the soil of each of the locations of the wind turbines first needed to be subjected to a meticulous inspection.
- The results of the soil investigation were used to work out the correct foundation and the exact dimensioning in first the basic design, then the integrated design and finally the detailed design.
|
| |