THE LANDCABLESThe (two 3-fase 150kV) submarine cables are connected at the landing point with (six mono-fase 150kv) land cables which are connected underground, over a distance of 3,3 km each, to the 'Slijkens' high-voltage switching station in Bredene. Consequently no high-voltage pylons will be built for the C-Power wind farm.
|
|||
| Scheldedijk 30 - Haven 1025 - 2070 Zwijndrecht, Belgium - Tel. + 32-3-250 55 51 - Fax + 32-3-250 55 52 - E-mail: c-power@c-power.be | |||