            2 phase 1 turbines

  • The Thornton Bank Wind Farm will be built in 3 phases – phase 1 with 6 x 5 MW turbines and phase 2 & 3 with together 48 x 6,15 MW turbines – and will be fully operational mid-2013.
  • The capacity of the completed wind farm will be 325,2 MW, enough to provide power to 600.000 inhabitants.

            Phase 1 turbines 6 x 5M Installation first turbine Phase 2

 

 
 